|
|
Product Details:
Payment & Shipping Terms:
|
CDL-300N water well drilling rig |
||||
Comprehensive overview | ||||
Depth:300M
|
||||
A. CHASSIS | ||||
Code | Name | Model | Remarks | |
A01 | Track chassis | Special Purpose for Engineering |
||
B.Drilling tower, Second floor chassis | ||||
Code | Name | Model | Parameter | Remarks |
B01 | Drilling tower | Retractable | Drill tower load:15T Operation:Two hydraulic support cylinders Drill tower height:6.8 |
|
B02 | Pull up-Pull down cylinder | Cylinder-wire rope structure | Pull down:7T Pull up: 20T |
|
B03 | Outrigger cylinder |
High outrigger oil cylinder | self loading and unloading Brace:Four hydraulic leg cylinders Equipped with hydraulic lock to prevent leg retraction trip:1500MM |
|
C. Drilling rig power | ||||
Code | Name | Model | Parameter | Remarks |
C01 | Diesel engine | Power:120KW Type:Four Cylinders, Water Cooling and Mechanical Supercharging Revolutions:1800R/MIN |
||
C02 | Diesel Engine Monitor |
Matching |
Monitoring information such as speed, temperature and so on through diesel engine sensors | |
D.Mud pump | ||||
Code | Name | Model | Remarks | |
D01 | Mud pump | 720L/MIN 3MPA | ||
E. Tool hoist | ||||
Code | Name | Model | Parameter | Remarks |
E01 | Hoist | ZYJ1B | Single rope pull up:1T | |
F. Rotation form hydraulic power head |
||||
Code | Name | Model | Parameter | Remarks |
F01 | Power head | Torque:7500NM Revolutions:0-90 RPM |
||
H. Other Parts and Components | ||||
Code | Name | Model | Parameter | Remarks |
H02 | Foam pump | B-36EX1 | Flow:42L/MIN Pressure:4MPA Revolutions:660R/MIN Improving the up-and-down efficiency of drilling cuttings, cooling and lubricating the impactor |
|
I.operating system | ||||
Code | Name | Model | Parameter | Remarks |
I01 | Control box | Integrated console Lifting and boring tower, outrigger cylinder, lifting, lowering, power head , etc. Instrument: drilling tool weight gauge, system pressure gauge, etc. |
Contact Person: Mr. FU
Tel: +8613132532671